Dover, DE 19901,1119 HARVEST GROVE TRL
Dover, DE 19901,1119 HARVEST GROVE TRL
Dover, DE 19901,1119 HARVEST GROVE TRL
Dover, DE 19901,1119 HARVEST GROVE TRL
Dover, DE 19901,1119 HARVEST GROVE TRL
Dover, DE 19901,1119 HARVEST GROVE TRL
REQUEST A TOUR If you would like to see this home without being there in person, select the "Virtual Tour" option and your agent will contact you to discuss available opportunities.
In-PersonVirtual Tour
Tue
13
Jan
Wed
14
Jan
Thu
15
Jan
Listed by Jeffrey Fowler-Gray • Keller Williams Realty
$ 549,900
Est. payment | /mo

4 Beds

3 Baths

2,982 SqFt


$ 549,900
Est. payment | /mo

4 Beds

3 Baths

2,982 SqFt

Key Details

Property Type Single Family Home

Sub Type Detached

Listing Status Active

Purchase Type For Sale

Square Footage 2,982 sqft

Price per Sqft $184

Subdivision Hazel Farm

MLS Listing ID DEKT2039370

Style Colonial

Bedrooms 4

Full Baths 2

Half Baths 1

HOA Fees $150/qua

HOA Y/N Y

Abv Grd Liv Area 2,982

Year Built 2010

Available Date 2025-08-01

Annual Tax Amount $2,436

Tax Year 2024

Lot Size 0.341 Acres

Acres 0.34

Lot Dimensions 87.41 x 170.60

Property Sub-Type Detached

Source BRIGHT

Property Description

Welcome to this beautifully crafted 2-story Colonial that blends timeless charm with modern comfort. Boasting 4 spacious bedrooms, 2.5 bathrooms, and exceptional living spaces throughout, this home offers everything you need—and more.

Step inside to gleaming hardwood floors that run seamlessly throughout the entire home. The main level features a private office, a formal dining room with crown molding, and a large living room anchored by a cozy gas fireplace. The chef's kitchen is a true centerpiece with a center island, abundant cabinetry, and a bright morning room that leads out to an expansive white deck.

Upstairs, you'll find four generously sized bedrooms, including a luxurious primary suite with a lighted tray ceiling, walk-in closet, and a spa-inspired ensuite bath featuring a jetted soaking tub, separate tiled shower, and dual vanities. The hallway bath is perfect for family or guests, and crown molding continues throughout, adding a touch of sophistication in every room.

The fully carpeted basement offers additional living space and includes a rough-in for a half bath—perfect for future expansion. An attached two-car garage adds convenience and ample storage.

Step outside to your private retreat: a stunning white deck with a pergola, a screened gazebo, and a sunken hot tub (non-working, but ready for restoration) that brings resort-style living right to your backyard, which backs to the woods with a pond view. The lush yard is supported by a sprinkler system, and the home comes equipped with owned solar panels and a whole-house water filtration system for added efficiency and peace of mind.
This one-of-a-kind home has it all—space, style, and standout features both inside and out.

Don't miss your chance to own this exceptional property—schedule your private showing today!

Location

State DE

County Kent

Area Capital (30802)

Zoning RS1

Rooms

Other Rooms Living Room, Dining Room, Primary Bedroom, Bedroom 2, Bedroom 3, Bedroom 4, Kitchen, Family Room, Foyer, Breakfast Room, Exercise Room, Laundry, Office, Bathroom 1, Bathroom 2, Half Bath

Basement Fully Finished, Heated, Full, Sump Pump, Water Proofing System, Windows

Interior

Interior Features Bathroom - Jetted Tub, Bathroom - Tub Shower, Breakfast Area, Carpet, Ceiling Fan(s), Crown Moldings, Dining Area, Family Room Off Kitchen, Floor Plan - Traditional, Formal/Separate Dining Room, Kitchen - Gourmet, Kitchen - Island, Pantry, Primary Bath(s), Recessed Lighting, Sprinkler System, Store/Office, Upgraded Countertops, Walk-in Closet(s), Water Treat System, Window Treatments, Wood Floors

Hot Water 60+ Gallon Tank

Heating Solar - Active, Forced Air

Cooling Central A/C

Flooring Hardwood

Equipment Built-In Microwave, Cooktop, Dishwasher, Disposal, Dryer - Electric, Exhaust Fan, Humidifier, Microwave

Furnishings No

Fireplace N

Appliance Built-In Microwave, Cooktop, Dishwasher, Disposal, Dryer - Electric, Exhaust Fan, Humidifier, Microwave

Heat Source Natural Gas

Laundry Main Floor

Exterior

Parking Features Garage - Front Entry, Garage Door Opener

Garage Spaces 6.0

Utilities Available Cable TV

Amenities Available Pool - Outdoor, Fitness Center

Water Access N

View Pond, Trees/Woods

Roof Type Architectural Shingle

Street Surface Black Top

Accessibility 32\"+ wide Doors

Attached Garage 2

Total Parking Spaces 6

Garage Y

Building

Lot Description Adjoins - Open Space, Backs to Trees, Cul-de-sac, Pond, Rear Yard, SideYard(s)

Story 2

Foundation Block

Above Ground Finished SqFt 2982

Sewer Public Sewer

Water Public

Architectural Style Colonial

Level or Stories 2

Additional Building Above Grade, Below Grade

Structure Type 9'+ Ceilings,Cathedral Ceilings,Dry Wall,Tray Ceilings

New Construction N

Schools

Elementary Schools Towne Point

Middle Schools Central

High Schools Dover

School District Capital

Others

Pets Allowed Y

HOA Fee Include Common Area Maintenance,Management,Pool(s)

Senior Community No

Tax ID LC-00-03704-07-7400-000

Ownership Fee Simple

SqFt Source 2982

Security Features Motion Detectors,Smoke Detector

Acceptable Financing Cash, Conventional, FHA, VA

Listing Terms Cash, Conventional, FHA, VA

Financing Cash,Conventional,FHA,VA

Special Listing Condition Standard

Pets Allowed No Pet Restrictions

Virtual Tour https://mylistings.tylersmileyphotography.com/vd/202727606

Bright MLS (BMLS)
Main Office

"My job is to find and attract mastery-based agents to the office, protect the culture, and make sure everyone is happy! "

+1(973) 337-6475

hello@burgosrealty.com

209 Cooper Avenue, Montclair, New Jersey, 07043, USA

GET MORE INFORMATION

Name
Phone*
Message

Go tour this home

1119 HARVEST GROVE TRL